ARK.] UNTIEDT v. ST. LOUIS S.W. Ry . CO. 941 WI-Lids T. Th g -TIEDT v. ST. LOUIS SOUTHWESTERN RAILWAY CO. 5-4893 440 S.W. 2d 251 Opinion Delivered May 12, 1969 r. RailroadsFailure to Keep LookoutReview.—When asserted negligence is failure to keep a constant lookout, carrier is entitled to directed verdict if undisputed testimony shows that lcokout was being kept, but not when crew's testimony is inconsistent within itself or contrary to other accepted testimony. 2. RailroadsAccidents at CrossingsFailure to Keep Lookout Jury Question.—Directed verdict for railroad held error where evidence in action to recover for damages to truck trapped on tracks at highway crossing presented jury question on lookout issue. 3. RailroadsDuty to Maintain Highway Approaches to Tracks Statutory Provisions.—Appellant's contention that railroad had duty to maintain state highway approaches to railroad tracks held without merit in view of provisions of Ark. Stat. Ann. § 76-517 (Repl. 1957). Appeal from Jefferson Circuit Court, Henry W. Smith, Judge; reversed. Terra!, Rawlings, Matthews & Purtle for appellant. Colemon. Gantt, Ramsay . & Cox for appellee. CONLEY BYRD, Justice. Appellant Willis T. TJntiedt .sued St. Louis Southwestern Railway Co. for the darn-
942 UNTIEDT v. ST. Louis S.W. RI". Co. [246 ages. that :occurred to his tandem lowboy truck after it became trapped on the railrOad tracks at the Highway SS crossing in Altheimer. The trial court directed a verdict for the railroad. Untiedt for reversal claims that there was sufficient evidence to take the case to the jury on the failure to keep a lookout and the statutory duty of the railway company to maintain the approaches to its tracks at the crossing. The appellee's tracks in the City of Altbeimer run from southwest to northeast. Its trains are controlled --dispateher in Pine Bluff through the use of signal blocks. A. train from Pine Bluff approaching Altheimer commences to blow its horn at the Cotton Center crossing . described as being 15 pole lengths from the Highway crOssing. A - pole . length is 176 feet. The signal block controlling north bound trains is 10 pole lengths or 1760. feet southwest of. the highway crossing. The highway over which Untiedt was routed with his permit load in the city of Altheimer paralled the railroad track, on the north side, from west to east commencing at Olive Street pasf Chestnut Street, Main Street and on to Ed-line Street.. The railway depot is located between Main and Edline Streets on tbe north side of- the ].'ailroad tracks between the highway and the tracks. I.Intiedt and twoother tractor lowboy rigs were hauling .. experimental . cotton-Picking machines from Santa Rosa i Texas, to the John Deere place in Altheimer. When they reached Altbeimer, the three units were parked beside the highway near the depot while the lead driver sought : information about their destination. The lead vehicle and Untiedt's vehicle parked between Main Street and the Highway SS crossing. The driver of the third vehicle parked parallel' with the highway between Chestnut Street and Main Street, at the western edge of Main Street. The third truck remained at this position during . the collision involved here. After the lead driver obtained his information, be pulled up and made a right tUrn across the Highway 88 crossing. The lead driver
ARK.] UNTIEDT v. ST. LOUIS S.W. RY. CO. 943 had no difficulty crossing the tracks. When Untiedt pulled up to make his right turn across the tracks the lowboy he was pulling became stuck on a hump or hogs-back or rise in the approach to the crossing, trapping Untiedt's truck on the tracks so that he could,. go neither forward or backward. Untiedt testified that the first thing he did when he w ot out of his truck and saw what was wrong was to 0-0 around the truck and right over to the depot. He estimates that about 15 minutes elapsed from the time he became stuck until tlie collision. On direct examination he stated that he was in the depot from 5 . to 10 minutes and on cross examination says that it could be anywhere from 2 to 6 minutes. He had left the depot and was standing outside when the train struck his truck. When asked, On direct, what Ralph Cratin, the driver of the number three- truck was doing, Untiedt stated: ''A. Well, he went out on the track and went down the track to see if he knew what was wrong, he knew what was going on, he could see it and he went Out on this track and down the track , a short distance and waved his arms and tried to wave this help to get this train stopped. In any event he was going down the track waving. his arms? ccA. Right. " Q. Now where was he with reference to this, was he on the Pine Bluff side of this building here or was be between the building and highway 88? . 'A No, he was down towards Pine Bluff just about a block, well, I don't ' know if it would be a block, it would be a :long block from the crossing where I was to the next crossing tOwards Pine Bluff.
944 UNTIEIrr v. ST. LOUIS S.W. B. CO. [246 Q. Towards which the train was coming. In any event, you say he would be on tbe Pine Bluff side of the depot? A. -Right. "Q. All right, now from the Pine Bluff side of this .depot, Mr. Untiedt, and looking down towards Pine Bluff what distance down that way could you see a train coming? Well, you could see a train coming from where he was quite a distance . down. Now what would you classify as quite a distance? "A. Well, I don't know, maybe a couple of miles, maybe two or three." Untiedt says that the front of the train stopped within a 100 to 150 feet past the point of impact. On cross examination Untiedt testified: "Q. Where was the second, actually the third truck driver, where was he located at that time? "A. Approximately a block down the street by the next crossing, just say he was parked to enter the next crossing. "Q: He hadn't started up to follow you? " A. No: no, when I went around I headed, I went to the depot and at the same time evidently he went on the track because when I come out of the depot, (interrupted) Q. You didn't see him what he did?
ARK.] UNTIEDT V. ST. LOUIS S.W. BY. Co. 945 "AIR. RAWLINGS: Let him finish answering the question Mr. Lile before you interrupt him. "A. Because when I came out of the depot he was down there on the track, he was going down the track. I couldn't see him when I was in the depot. "Q. Okay, how many minutes would you say elapsed from the time you first got hung up and when you went into the depot? - "A. Oh, it wasn't but a few, just long enough to walk down there. "Q. I believe you stated on direct examination that the overall time, from the time that you got hung up until you were coming out of the depot was .about fifteen minutes? "A: Approximately, yes. c Is that correct? "A. That's right. "Q. And you said you were in tbe depot from five to ten minutes, I'm not sure? "A. Well, it could have been. It could have been two, it could have been six. Whatever it took long enough for him to call down there and hint go, we got out of the depot. "Q. But overall it took about fifteen minutes? "A. Well, approximately, I mean I didn't time it. CC Q. You really don 't know exactly what the third truck driver did after you got hung up did you?
946 V-UNTI.ED.]: ST. Louis S.W. RY. CO. 1-.246 You didn't see him in his truck or his truck wasn't moving was it? "A. No. It was parked." Arden Vasser, a witness called out of turn by the railroad estimated that the train went a car and a half or two cars after it hit -Untiedt's truck. At this point in the trial, Untiedt introduced the railroad company's answer to his interrogatories as follows: "Q. Now during the past fifteen years, state the dates and owners thereof of all vehicles which were hung while down Highway 88 at this crossing mentioned in plaintiff's complaint. "Answer: September 10, 1964, S. P. Conners. Sep-tember 2, 1966 Willis Untiedt. "Q. No. 10. State where the train station at Al-theimer is located with reference to the crossing mentioned in plaintiff's complaint. "Answer: North edge of Station is 215 feet South of crossing. Q. State the name and address of all employees of St. Louis Southwestern Railway Lines who were working in or near this station at the time of the collision mentioned in plaintiff's complaint. "Answer: L. K. Baker, 1115 Pine Street, Pine Bluff, Arkansas. "Q. State what was done by such employees to warn the approaching train that plaintiff's truck was hung on the crossing. "Answer: The operator of the vehicle, Willis Un-tiedt, informed the Relief Agent, L. K. Baker,
ARK.] UNTIEDT v. ST. LOUIS S.W. Ry. CO. 947 that his trailer was hung up in the street with the tractor fouling the track, and Mr. Baker telephoned the Chief Dispatcher in Pine Bluff, who advised him that a North bound train was closely approaching . the Altheimer station. The Chief Dispatcher informed Mr. Baker that the North bound train had already passed the last signal and the train crew could not be warned by signals of the existing condition at the crossing. Therefore, Mr. Baker started running in the direction of the approaching train, waiving. a red flag in an effort to stop the train short of the crossing. State the speed of the train at the time it struck plaintiff's truck. "Answer: Approximately 3 to 5 miles per hour. "Q. How far was such train from the crossing when its brakes were applied? "Answer: Approximately SOO feet. "Q. Was the emergency brakes applied? "Answer : Yes. "Q. Who applied the brakes and what is his title? "Answer: E. P. Shanafelt, Locomotive Engineer. "Q. For wbat distance could the employees of the train see the crossing and plaintiff's truck prior to the collision? "Answer: Approximately 700 feet. "Q. What obstruction or obstructions prevents from seeing . further down the track?
948 ENTIEDT V. ST. LOUIS S.W. RY. Co. [246 " Answer : Altheimer depot." . Mr. Ernest Johnson the fireman testified that the train consisted of 112 or 115 cars and that be was sitting in the fireman's seat on the left band side. The train conimenced to blow its whistle at the Cotton Center crossing some 15 pole lengths from the highway crossing. When the train reached the section foreman's house, 9 pole lengths from the highway crossing, he saw somebody running up the track waving his arms. At this point he could not see the highway crossing because of the depot. He says the emergency brakes were applied at a point 8 pole lengths west of the crossing at a time when the train was running at a speed of 45 miles per hour (66 ft. per. second). He estimated the speed of the train at the time of collision to be 5 miles per hour. He said, "I thought we was going to get stopped but we didn't quite make it". Mr. Johnson testified that the first time he saw Ralph Cratin, Cratin was at a point near Olive Street rumling down the railroad tracks waving his arms (approximately 500 feet west of the Main Street crossing). He says there was a gradual curve in the railroad starting about the point where he saw Cratin. On cross-examination he said you could see a person a half mile clear enough to distinguish a man from a woman or child and that, a person running was much more easily seen than a person standing still. Exhibit No. 7, a 'plat of the Altheimer station, indi-eates that the tracks are relatively straight from the Cotton Center crossing to a point some 200 feet east of the place where Johnson says be saw Cratin, and only a gradual curve from that point to the depot. In Lovegrove v. Missowri Pacific Railroad Co., 245 Ark. 1021, 436 S.W. 2d 798 (1969), we held: "When the asserted negligence is a failure to keep a constant lookout the carrier is entitled to a directed verdict if the undisputed testimony of the
ARK.] UNTIEDT v. ST. Louis S.W. R y. Co. 949 train crew shows that such a lookout was being' kept. St. Louis-San Francisco Ry. v. Spencer, 231 Ark. 221., 328 S.W. 2d 858 (1.959). But the jury may disregard the crew's testimony when it is inconsistent within itself or contrary to other accepted testimony in the case. Railway Co. v. Chambliss, 54 A.rk. 214, 15 S.W. 469 (1891). In this case too, Johnson testified that he was keep- - a proper lookout but when his testimony is consid- ered in connection with the plat and testimony of the other witnesses we find that a jury question was made on the lookout issue. Untiedt testified that a person from Cratin's position, that is, west of the depot, could see a train for two miles. Johnson did not testify that he saw Cratin when he first came on the track or that there was any obstruction to prevent him from seeirng him a. few seconds prior to the time that he actually observed him. When we consider that tbe train was traveling at a speed of 66 feet per second, and that it only lacked a 100 or 150 feet of being' stopped in time to avoid the collision, we find that under the circumstances there was sufficient evidence to go to the jury on the issue of whether a proper lookout was being maintained. This is particularly true in a case such as this where Cratin bad to be on the tracks or in the vicinity thereof for a period in excess of 10 seconds to have run to the point described by the fireman. For this reason we bold that the trial court was in error in directing a verdict for the railroad. We find no merit in. Untiedt's 'contention that the railroad bad a duty to maintain the highway approaches to the railroad tracks. To support his contention, Untie& relied upon Ark. Stat. .Ann. § 73-614 (Repl. 1957) and St. Louis, Iron Mt. & Southern Railway Co. v. Smith, 118 Ark. 72, 175 S.W. 41.5 (1.915) and Payne v. Stockton, 1.47 Ark. 598, 229 S.W. 44 (1921.). However, by the Acts of 1929, No. 65 § 59, an Act to Amend and Codify the Laws Relating to State Highways (Ark. Stat. Ann. § 76- 517 [Repl. 19571), it was provided:
950 [246 - "It shall be the duty of the members of the Highway Commission and of the State Highway Engineers, on all trips in the State to particularly observe crossings of railroads on State highways, and it shall be the duty of all railroad companies and the owners of tramroads whose lines intersect or cross any of the highways of the State to improve that part of the roadway between their tracks and to the end of the cross ties on eneh side with the same material (wherever practicable), with the same foundation and surface as that in the adjoining portions of the roadway and to maintain such crossings in a good state of repair, and said Highway Commission shall have power and authority to require any and all railway companies to build and construct roads under their tracks at such crossings as in the judgment of the Commission will be for the best and safest interest of the traveling public.* As we interpret this statute it limits the duty of all railway companies whose lines intersect or cross any of the highways of the state to improve all of that part of the roadway between their tracks and to the end of the cross ties on each side and relieves them from any duty of maintenance beyond the end of the cross ties. Reversed and remanded.